Case Studies

Case Studies

Tuckabianna Gold Plant – Cue WA.

LPG gas installation work connecting to pipe work by Kleenheat Gas on LPG Tank Farm.

  • Connect drainage to all fixtures on plan and run to sewer pump station
  • Connect water service to all fixtures on plan from existing water service line
  • Installation of 4 x hot water units, test and commission
  • Commission and test all water connection to fixtures, including all drainage points
  • Supply and install thermostatic mixing valves on hot water units

St Patricks Cathedral, Bunbury

  • Fire mains
  • Commissioning Plumbing
  • Sewer works
  • Site Drainage

St Patricks Cathedral

Margaret River Recycled Water 

  • Head Contractor to the government body Integration into existing Water Corporation treatment plant
  • Large diameter polyethylene pipe using polywelding techniques
  • Detailed and complex river crossing requirement
  • Significant environmental considerations
  • Consideration for Indigenous heritage areas


The Silo’s, Bunbury Waterfront

  • Multi storey luxury development
  • Fire mains and commissioning
  • Plumbing and sewer works
  • Site Drainage
  • Supply correct ventilation for drainage, including overflow points.
  • Supply and install access for rodding points in drainage pipe work.

silos waterfron